APPENDIX No. 9 B.-TABLE OF CONTRACTS OF BOARD OF PUBLIC WORKS. TABLE NO. 3.-Contracts and extensions of board of public works on which measurements have been made under the direction of the engineer of the District of Columbia at the request of the board of audit, the work having been completed under the board of public works. Amended to embrace grading and laying a 12-inch- Construct, with man-holes, traps, and laterals, the fol- 18-inch-pipe sewer on west side. B st., bet. 5th and 6th sts., 8. e 5th st., bet. B and C sts., s. e......... $86 52 $45, 887 87 5,651 63 62, 616 85 5, 356 08 99, 914 50 26, 620 46 TABLE NO. 3.-Contracts and extensions of board of public works, &c.-Continued. Amended to include setting curbs and laying footwalks B st., bet. 1st and 2d sts., n. e..... 1,911 40 3,021 71 2,961 42 9,704 12 15,781 01 7,940 20 62, 660 65 57, 733 47 219, 211 46 124, 980 47 11, 208 46 11, 105 51 19, 279 67 5,623 62 Lay footwalks, grade, and set curbs. 692 J. V. W. Vanden. d Grade, set curbs, lay footwalks, sewer on... July 7, 1873 738 H. L. Gallagher, (Gal 1,377 46 Square 364. 1,312 99 a Excess of audit over engineer's measurement, $962.58. b Excess of audit over engineer's measurement, $1,554.81. c The work of filling Washington Canal was placed by the board of audit to the account of miscellaneous work and not to contract 666. The entries in the book of the board of audit are as follows, viz: December 21, 1871, paper 50 April 29, 1872, paper 1353.. May 21, 1873, paper 1797.. June 12, 1873, paper 1935 and 1936. July 17, 1873, paper 2128. September 3, 1873, paper 2799 Total d Included in item of $49,899.47 below. e Excess of audit over engineer's measurement, $7,586.47. g This sewer was laid through square 336, (alley,) instead of on the street. $1,233 50 472 30 1,356 20 68,824 00 h Excess of audit over engineer's measurement, 26 cents. fOrder of November 21, 1873. Not mentioned in written contract. |