ings accounts that can be identified with and directly assigned to the project.

NOTE: The purpose of this instruction is to insure that accounts or records are currently maintained by each licensee from which reports may be made to the Commission for use in determining the net investment in each licensed project. The instruction covers only the debit and credit items appearing in the licensee's accounts which may be identified with and assigned directly to any licensed project. In the determination of the net investment as defined in section 3 of the Federal Power Act, allocations of items affecting the net investment may be required where direct assignment is not practicable.

Electric Plant Instructions

1. Electric Plant To Be Recorded at Cost.

A. All amounts included in the accounts for electric plant acquired as an operating unit or system, except as otherwise provided in the texts of the intangible plant accounts, shall be stated at the cost incurred by the person who first devoted the property to utility service. All other electric plant shall be included in the accounts at the cost incurred by the utility. Where the term "cost" is used in the detailed plant accounts, it shall have the meaning stated in this paragraph.

B. When the consideration given for property is other than cash, the value of such consideration shall be determined on a cash basis. (See, however, deflnition 8). In the entry recording such transaction, the actual consideration shall be described with sufficient particularity to identify it. The utility shall be prepared to furnish the Commission the particulars of its determination of the cash value of the consideration if other than cash.

C. When property is purchased under a plan involving deferred payments, no charge shall be made to the electric plant accounts for interest, insurance, or other expenditures occasioned solely by such form of payment.

D. Electric plant contributed to the utility or constructed by it from contributions to it of cash or its equivalent shall be charged to the electric plant accounts at cost of construction, estimated if not known. There shall be credited to the accounts for accumulated depreciation and amortization the estimated amount of depreciation and amortization

applicable to the property at the time of its contribution to the utility. The difference between the amounts included in the electric plant accounts and the accumulated depreciation and amortization shall be credited to account 271, Contributions in Aid of Construction.

2. Components of Construction Cost. The cost of construction of property chargeable to the electric plant accounts shall include, where applicable, the cost of labor, materials and supplies, transportation, work done by others for the utility, injuries and damages incurred in construction work, privileges and permits, special machine service, allowance for funds used during construction, and such portion of general engineering, administrative salaries and expenses, insurance, taxes, and other analogous items as may be properly includible in construction costs.

A. All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction engineering and supervision by others than the accounting utility, law expense, insurance, injuries and damages, relief and pensions, taxes and interest, shall be charged to particular jobs or units on the basis of the amounts of such overheads reasonably applicable thereto, to the end that each job or unit shall bear its equitable proportion of such costs and that the entire cost of the unit, both direct and overhead, shall be deducted from the plant accounts at the time the property is retired.

B. As far as practicable, the determination of payroll charges includible in construction overheads shall be based on time card distributions thereof. Where this procedure is impractical, special studies shall be made periodically of the time of supervisory employees devoted to construction activities to the end that only such overhead costs as have a definite relation to construction shall be capitalized. The addition to direct construction costs of arbitrary percentages or amounts to cover assumed overhead costs is not permitted. 4. Electric Plant Purchased or Sold. A. When utility plant constituting an operating unit or system is acquired by purchase, merger, consolidation, liquidation, or otherwise, after the effective date of this system of accounts, the costs of acquisition, including expenses incidental thereto properly includible in

utility plant, shall be charged to account 102, Electric Plant Purchased or Sold. B. The accounting for the acquisition shall then be completed as follows:

(1) The original cost of plant, estimated if not known, shall be credited to account 102, Electric Plant Purchased or Sold, and concurrently charged to the appropriate utility plant in service accounts and to account 104, Electric Plant Leased to Others, account 105, Electric Plant Held for Future Use, and account 107, Construction Work in ProgressElectric, as appropriate.

(2) The depreciation and amortization applicable to the original cost of the properties purchased, shall be charged to account 102, Electric Plant Purchased or Sold, and concurrently credited to the appropriate account for accumulated provision for depreciation or amortization.

(3) The cost to the utility of any property includible in account 121, Nonutility Property, shall be transferred thereto.

(4) The amount of contributions in aid of construction applicable to the property acquired, shall be charged to account 102, Electric Plant Purchased or Sold, and concurrently credited to account 271, Contributions in Aid of Construction, unless otherwise authorized by the Commission.

(5) The amount remaining in account 102, Electric Plant Purchased or Sold, shall then be closed to account 114, Electric Plant Acquisition Adjustments.

C. If property acquired in the purchase of an operating unit or system is in such physical condition when acquired that it is necessary substantially to rehabilitate it in order to bring the property up to the standards of the utility, the cost of such work, except replacements, shall be accounted for as a part of the purchase price of the property.

D. When any property acquired as an operating unit or system includes duplicate or other plant which will be retired by the accounting utility in the reconstruction of the acquired property or its consolidation with previously owned property, the proposed accounting for such property shall be presented to the Commission.

E. In connection with the acquisition of electric plant constituting an operating unit or system, the utility shall procure, if possible, all existing records relating to the property acquired, or certified copies thereof, and shall preserve such records in conformity with regula

tions or practices governing the preservation of records of its own construction.

F. When electric plant constituting an operating unit or system is sold, conveyed, or transferred to another by sale, merger, consolidation, or otherwise, the book cost of the property sold or transferred to another shall be credited to the appropriate electric plant accounts, including amounts carried in account 114, Electric Plant Acquisition Adjustments, and the amounts (estimated if not known) carried with respect thereto in the accounts for accumulated provision for depreciation and amortization and in account 252, Customer Advances for Construction, and account 271, Contributions in Aid of Construction, shall be charged to such accounts and the contra entries made to account 102, Electric Plant Purchased or Sold. Unless otherwise ordered by the Commission, the difference, if any, between (a) the net amount of debits and credits and (b) the consideration received for the property (less commissions and other expenses of making the sale), shall be included in account 421.1, Gain on Disposition of Property, or account 421.2, Loss on Disposition of Property. (See account 102, Electric Plant Purchased or Sold.)

NOTE: In cases where existing utilities merge or consolidate because of financial or operating reasons or statutory requirements rather than as a means of transferring title of purchased properties to a new owner, the accounts of the constituent utilities, with the approval of the Commission, may be combined. In the event original cost has not been determined, the resulting utility shall proceed to determine such cost as outlined herein.

5. Expenditures on Leased Property. A. The cost of substantial initial improvements (including repairs, rearrangements, additions and betterments) made in the course of preparing for utility service property leased for a period of more than one year, and the cost of subsequent substantial additions, replacements, or betterments to such property, shall be charged to the electric plant account appropriate for the class of property leased. If the service life of the improvements is terminable by action of the lease, the cost, less net salvage, of the improvements shall be spread over the life of the lease by charges to account 404, Amortization of Limited-Term Electric Plant. However, if the service life is not terminated by action of the lease but by depreciation

proper, the cost of the improvements, less net salvage, shall be accounted for as depreciable plant.

B. If improvements made to property leased for a period of more than one year are of relatively minor cost, or if the lease is for a period of not more than one year, the cost of the improvements shall be charged to the account in which the rent is included, either directly or by amortization thereof.

6. Land and Land Rights.

A. The accounts for land and land rights shall include the cost of land owned in fee by the utility and rights, interests, and privileges held by the utility in land owned by others, such as leaseholds, easements, water and water power rights, diversion rights, submersion rights, rights-of-way, and other like interests in land. Do not include in the accounts for land and land rights and rights-of-way costs incurred in connection with first clearing and grading of land and rights-of-way and the damage costs associated with the construction and installation of plant. Such costs shall be included in the appropriate plant accounts directly benefited.

B. Where special assessments for public improvements provide for deferred payments, the full amount of the assessments shall be charged to the appropriate land account and the unpaid balance shall be carried in an appropriate liability account. Interest on unpaid balances shall be charged to the appropriate interest account. If any part of the cost of public improvements is included in the general tax levy, the amount thereof shall be charged to the appropriate tax account.

C. The net profit from the sale of timber, cord wood, sand, gravel, other resources or other property acquired with the rights-of-way or other lands shall be credited to the appropriate plant account to which related. Where land is held for a considerable period of time and timber and other natural resources on the land at the time of purchase increases in value, the net profit (after giving effect to the cost of the natural resources) from the sales of timber or its products or other natural resources shall be credited to the appropriate utility operating income account when such land has been recorded in account 105, Electric Plant Held for Future Use, otherwise to account 421, Miscellaneous Nonoperating Income.

84-063 0-73- -24

D. Separate entries shall be made for the acquisition, transfer or retirement of each parcel of land, and each land right (except rights of way for distribution lines), or water right having a life of more than one year. A record shall be maintained showing the nature of ownership, full legal description, area, map reference, purpose for which used, city, county, and tax district in which situated, from whom purchased or to whom sold, payment given or received, other costs, contract date and number, date of recording of deed, and book and page of record. Entries transferring or retiring land or land rights shall refer to the original entry recording its acquisition.

E. Any difference between the amount received from the sale of land or land rights, less agents' commissions and other costs incident to the sale, and the book cost of such land or rights shall be included in account 411.6, Gains from Disposition of Utility Plant, or 411.7, Losses from Disposition of Utility Plant when such property has been recorded in account 105, Electric Plant Held for Future Use, otherwise to account 421.1, Gain on Disposition of Property, or 421.2, Loss on Disposition of Property, as appropriate, unless a reserve therefor has been authorized and provided. Appropriate adjustments of the accounts shall be made with respect to any structures or improvements located on land sold.

F. The cost of buildings and other improvements (other than public improvements) shall not be included in the land accounts. If at the time of acquisition of an interest in land such interest extends to buildings or other improvements (other than public improvements), which are then devoted to utility operations, the land and improvements shall be separately appraised and the cost allocated to land and buildings or improvements on the basis of the appraisals. If the improvements are removed or wrecked without being used in operations, the cost of removing or wrecking shall be charged and the salvage credited to the account in which the cost of the land is recorded.

G. When the purchase of land for electric operations requires the purchase of more land than needed for such purposes, the charge to the specific land account shall be based upon the cost of the land purchased, less the fair market value of that portion of the land which is not to be used in utility operations. 361

The portion of the cost measured by the fair market value of the land not to be used shall be included in account 105, Electric Plant Held for Future Use, or account 121, Nonutility Property, as appropriate.

H. Provision shall be made for amortizing amounts carried in the accounts for limited-term interests in land so as to apportion equitably the cost of each interest over the life thereof. (See account 404, Amortization of Limited-Term Electric Plant.)

I. The items of cost to be included in the accounts for land and land rights are as follows:

1. Bulkheads, buried, not requiring maintenance or replacement.

2. Cost, first, of acquisition including mortgages and other liens assumed (but not subsequent interest thereon).

3. [Reserved]

4. Condemnation proceedings, including court and counsel costs.

5. Consents and abutting damages, payment for.

6. Conveyancers' and notaries' fees.

7. Fees, commissions, and salaries to brokers, agents and others in connection with the acquisition of the land or land rights.

8. [Reserved]

9. Leases, cost of voiding upon purchase to secure possession of land.

10. Removing, relocating, or reconstructing property of others, such as buildings, highways, railroads, bridges, cemeteries, churches telephone and power lines, etc., in order to acquire quiet possession.

11. Retaining walls unless identified with structures.

12. Special assessments levied by public authorities for public improvements on the basis of benefits for new roads, new bridges, new sewers, new curbing, new pavements, and other public improvements, but not taxes levied to provide for the maintenance of such improvements.

13. Surveys in connection with the acquisition, but not amounts paid for topographical surveys and maps where such costs are attributable to structures or plant equipment erected or to be erected or installed on such land.

14. Taxes assumed, accrued to date of transfer of title.

15. Title, examining, clearing, insuring and registering in connection with the acquisition and defending against claims relating to the period prior to the acquisition.

16. Appraisals prior to closing title.

17. Cost of dealing with distributees or legatees residing outside of the state or county, such as recording power of attorney, recording will or exemplification of will, recording satisfaction of state tax.

18. Filing satisfaction of mortgage.

19. Documentary stamps.

20. Photographs of property at acquisition. 21. Fees and expenses incurred in the acquisition of water rights and grants.

22. Cost of fill to extend bulkhead line over land under water, where riparian rights are held, which is not occasioned by the erection of a structure.

23. Sidewalks and curbs constructed by the utility on public property.

24. Labor and expenses in connection with securing right of way, where performed by company employees and company agents.

7. Structures and Improvements.

A. The accounts for structures and improvements shall include the cost of all buildings and facilities to house, support, or safeguard property or persons, including all fixtures permanently attached to and made a part of buildings and which cannot be removed therefrom without cutting into the walls, ceilings, or floors, or without in some way impairing the buildings, and improvements of a permanent character on or to land. Also include those costs incurred in connection with the first clearing and grading of land and rights-of-way, and the damage costs associated with construction and installation of plant.

B. The cost of specially provided foundations not intended to outlast the machinery or apparatus for which provided, and the cost of angle irons, castings, etc., installed at the base of any item of equipment, shall be charged to the same account as the cost of the machinery, apparatus, or equipment.

C. Minor buildings and structures, such as valve towers, patrolmen's towers, telephone stations, etc., which are used directly in connection with or form a part of a reservoir dam, waterway, etc., shall be considered a part of the facility in connection with which constructed or operated and the cost thereof accounted for accordingly.

D. Where furnaces and boilers are used primarily for furnishing steam for some particular department and only incidentally for furnishing steam for heating a building and operating the equipment therein, the entire cost of such furnaces and boilers shall be charged to the appropriate plant account, and no part to the building account.

E. Where the structure of a dam forms also the foundation of the power plant building, such foundation shall be considered a part of the dam.

F. The cost of disposing of materials excavated in connection with construc

tion of structures shall be considered as a part of the cost of such work, except as follows: (a) When such material is used for filling, the cost of loading, hauling, and dumping shall be equitably apportioned between the work in connection with which the removal occurs and the work in connection with which the material is used; (b) When such material is sold, the net amount realized from such sales shall be credited to the work in connection with which the removal occurs. If the amount realized from the sale of excavated materials exceeds the removal costs and the costs in connection with the sale, the excess shall be credited to the land account in which the site is carried.

G. Lighting or other fixtures temporarily attached to buildings for purposes of display or demonstration shall not be included in the cost of the building but in the appropriate equipment

account.

H. The items of cost to be included in the accounts for structures and improvements are as follows:

1. Architects' plans and specifications including supervision.

2. Athletic field structures and improvements.

3. Boilers, furnaces, piping, wiring fixtures, and machinery for heating, lighting, signaling, ventilating, and air conditioning systems, plumbing, vacuum cleaning systems, incinerator and smoke pipe, flues, etc.

4. Bulkheads, including dredging, riprap fill, piling, decking, concrete, fenders, etc., when exposed and subject to maintenance and replacement.

5. Coal bins and bunkers.

6. Commissions and fees to brokers, agents, architects and others.

7. Conduit (not to be removed) with its contents.

8. Damages to abutting property during construction.

9. Drainage and sewerage systems. 10. Elevators, cranes, hoists, etc., and the machinery for operating them.

11. Excavation, including shoring, bracing, bridging, refill, and disposal of excess excavated material, cofferdams around foundation, pumping water from cofferdam during construction, test borings.

12. Fences and fence curbs (not including protective fences isolating items of equipment, which shall be charged to the appropriate equipment account).

13. Fire protection systems when forming a part of a structure.

14. Foundations and piers for machinery, constructed as a permanent part of a building or other item listed herein.

15. Grading and clearing when directly occasioned by the building of a structure.

16. Intrasite communication system, poles, pole fixtures, wires and cables.

17. Landscaping, lawns, shrubbery, etc. 18. Leases, voiding upon purchase to secure possession of structures.

19. Leased property, expenditures on. 20. Lighting fixtures and outside lighting system.

21. Painting, first cost. 22. Permanent paving, concrete, brick, flagstone, asphalt, etc., within the property lines.

23. Permits and privileges.

24. Platforms, railings and gratings when constructed as a part of a structure.

25. Retaining walls except when identified with land.

26. Roadways, railroads, bridges, and trestles intrasite, except railroads provided for in equipment accounts.

27. Sidewalks, culverts, curba and streets constructed by the utility on its property. 28. Stacks-brick, steel, or concrete, when set on foundation forming part of general foundation and steel work of a building.

29. Storage facilities constituting a part of a building.

30. Subways, areaways, and tunnels, directly connected to and forming part of a structure.

31. Tanks, constructed as part of a building or as a distinct structural unit.

32. Temporary shanties and other facilities used during construction (net cost).

33. Tunnels, intake and discharge, when constructed as part of a structure, including sluice gates, and those constructed to house mains.

34. Vaults constructed as part of a building.

35. Water basins or reservoirs. 36. Wharves.

NOTE: Structures and Improvements accounts shall be credited with the cost of coal bunkers, stacks, foundations, subways, tunnels, etc., the use of which has terminated with the removal of the equipment with which they are associated even though they have not been physically removed.

8. Equipment.

A. The cost of equipment chargeable to the electric plant accounts, unless otherwise indicated in the text of an equipment account, includes the net purchase price thereof, sales taxes, inexpenses vestigation and inspection necessary to such purchase, expenses of transportation when borne by the utility, labor employed, materials and supplies consumed, and expenses incurred by the utility in unloading and placing the equipment in readiness to operate. Also include those costs incurred in connection with the first clearing and grading of land and rights-of-way and the damage costs associated with construction and installation of plant.