Imágenes de páginas
PDF
EPUB

Expenditures for repair of contract-work under section 9 of the original contracts-Continued.

[blocks in formation]
[ocr errors][ocr errors]
[ocr errors]

7, 400 22

3 20

Cranford & Hoffman

2, 285 14

T.......

Oct. 18, 1872 569 Chas. E. Evans, pres. Grade and lay Evans concrete pave. N st., bet. N. H. ave. and Scott $3 20 ident Evans Con- ment on carriage-way.

statue reservation.

$25, 969 03 crete Co. Set carbs....

N st., bet. N. H. ave. and 19th

st.
Aug. 13, 1875 569 Commissioners' ex. Resurface concrete pavement on the N st., bet. N. H. ave. and?
tension.
carriage-way.

Scott statue reservation.
Oct. 18, 1872 569 Chas. E. Evans, preg. Grade, set curbs .......

Pst., bet, 18th and 19th sts.,
ident Evans Con.

n. w. crete Co.

Lay Evans concrete pavement on side. Pst., bet. 18th st. and Circle,
walk and carriage-way.

n. w.
Aug. 13, 1375 569 Commissioners' ex Resurface concrete sidewalks and ......do
tension,

carriage-way.
Oct. 19, 1872 571 Lewis Clephane. Grade, set curbs. lay brick pavements, 12th st., bet. M and P sts., 3 50 | 128, 267 97

Sureties: Francis park, terrace, furnish and set Seneca II. W.
H. Smith, Thos. stone steps, and construct sewer-
Lewis.

laterals and water-services, and lay

Miller wood pavement.
Oct. 30, 1875 571 Commissioners' ex- Take up wood pavement for one or | 12th st., bet. F and P sts., .......
tension,
more squares, as may be directed.

n. W.
replace the same with vulcanite oon-
crete pavement, and the defective
places remaining in the wood pave-
ment to be repaired with the sound

blooks so removed. 51
Oct. 23, 1872 583 David L. DeGolyer, Lay DeGolyer wood pavement No. 2... Pa, avo., bet. 1st and 8th sts., 350 151, 436 23
Robt. McClellan.

8. e.
tension.
Oct. 23, 1875 583t Commissioners' ex. Take up wood pavement on north and Pa. ave., bet, 2d and 8th sts.,

south sides of Pennsylvania avenue, 8. o.
between Second and Eighth streets,
southeast, and replace the same with
concrete, and the defective places
on the south side to be repaired with
the sound blocks so removed.

[merged small][merged small][ocr errors][merged small][ocr errors]
[graphic]

Oot. 23, 1972 584 David L. DeGolyer, Lay DeGolyer wood pavement No. 2.. 8th st., bet. Pa. ave. and 3 50 51, 697 78
Robt. McClellan.

navy yard.
Sept. 11, 1875 584 Commissioners' ex. Take up wood pavement for one or ...... do ..

Noitzey & Acker ... 32, 588 47 1,484 56 tension.

more squares, as may be directed,
and replace the same with Belgian
block-pavement, the defective places
in the remaining part of the wood
pavement to be repaired with the

sound blocks so removed.
Dec. 6, 1872 620 John 0. Evans. Lay wood pavement........

13th st., bet. Pa. ave. and B 3 50 17, 835 22
Sureties: Lewis

st., n. w.
Clephane, Albert

Gleason.
Oct. 14, 1875 620 Commissioners' ex. Take up wood pavement for one or ......

Cranford & Hoffman 9, 111 48 691 03
tension.

more squares, as may be directed,
and replace the same with vulcanite
concrete pavement, and the defective
places in the remaining part of the
wood pavement to be repaired with

the sound blocks so removed.
Dec. 10, 1872 626 Lewis S. Filbert. Lay wood pavement..

10th st., bet. F and N sts., 3 50
Surety: Jonathan

n. W.
Taylor.
Aug.12, 1873 626 Extension board of

82, 373 95
......do ..........

10th st., bet. N and R sts., 3 50
public works.

n. w.
Oct. 14, 1875 626 Commissioners' ex. Take up wood pavement for one or 10th st., bet. F and M sts.,

Cranford & Hoffman. 14, 483 40 429 67
tension.

more squares, as may be directed, re n. w.
place the same with vulcanite con-
erete pavement, and the defective
places in the remaining part of the
wood pavement to be repaired with

the sound blocks so removed.
Dec. 12, 1872 627 Lewis S. Filbert. Lay wood pavement.....

11th st., bet. F and 0 sts., 3 5056, 659 17
Surety: Jonathan

n. w.
Taylor.
Oct. 14, 1875 627 Commissioners' ex. Take up wood pavement for one or
tension,

more squares, as may be directed, re-
place the same with vulcanite con-
crete pavement, and the defective ......do.

... Cranford & Hoffman. 11,579 70

S 1, 215 40
piaces in the remaining part of the

1769 24
wood pavement to be repaired with

the sound blocks so removed.
May 7, 1873 675 Chas. E. Evans, pres Lay Evans concrete pavement on side. R. I. ave., bet. Conn, ave, and
ident Evans Con. walks and carriage-way.

a point 200 feet east of 17th
crete Co. Sureties:

street.

11 35 OR 10 KM
Charles E. Evans,

Martha W. Evans.
Aug.13, 1875 675 Commissioners' ex- Resurface concrete sidewalks and car. R. I. ave., bet. Conn. ave. and

Cranford & Hoffman. 9, 909 17 309 27
tension.
riage-way.

a point 200 feet east of 17th

street. * Extra work. + $459, additional; 20 per cent. of work not certified to board of audit. Extra work; done to repair work performed under contract 29, L. Clephane.

[ocr errors]

Expenditures for repair of contract-work under section 9 of the original contracts--Continued.

[blocks in formation]
[ocr errors][merged small][ocr errors][ocr errors]

Sept. 8, 1873 890 Cbas.E. Evans, pres. Lay Evans concrete pavement on car. B st., bet. N. J. ave. and 28 $3 20
ident Evans Con. riage-way.

st., 8. e.
crete Co. Sureties: Do......

1st st. east, bet. B st, south 3 20
Charles E. Evans,

and the north side Pa. ave.
Martha W. Evaps.
Aug. 13, 1875 890* Commissioners' ex- Repair concrete pavement ............ B st., bet. N. J. ave. and 2d
tension.

st., 8. e., and 1st st. east, bet.
B st. sonth and the north

side of Pa. ave.
Sept. 26, 1873 913 Chas. E. Thurston. Construct 12-inch - pipe sewer, with Square 484 ......

Sureties: C.D.Will man-boles and traps in alley.
lard, J.T. H. Hall. Construct 9-inch-pipe sewer, with man- 5th st., bet. K and L sts., n.w.......

boles and traps on both sides.
Grade, set cuibg, lay brick pavements, 5th st., bet. G st. and N. Y. 3 20
construct sewer laterals and water

ave., n. w.

?
services, and lay Scharf concrete
pavement.

Square 5167...
Ang. 5, 1875 913 Commissioners' ex. Repair the concrete pavement......... 5th st., bet. G st. and N. Y.
tension.

ave., n. w.
Sept. 26, 1873 914 Chas. E. Evans, pres. Lay Evans concrete pavement ........ K st., bet. 3d and 7th sts., n.w. 3 20

ident Evans Con-
crete Co. Sureties:
Charles E. Evans,

Martha W. Evans.
Aug. 13, 1875 914 Commissioners' ex. Resurface and repair concrete pave-
tension,

ment.

[ocr errors][merged small][ocr errors][merged small][ocr errors][ocr errors][merged small]

* B street only.

Not mentioned in written contract.

VIII.-APPENDIX No. 10.-BOARD RATES.

These are the rates at which work has been done by the Commissiopers under contracts and extensions of the board of public works, the medium of payment being District 3.65 bonds. In the consideration of the question of these rates of the late board of public works, the printed eridence taken before the joint investigating committee of the Fortythird Congress, as well as the record of the action of the board of public works, in general and in particular cases, have been examined. The result is giren in the following table, which gives the board rates as they have been ascertained and adhered to in the engineer's office:

[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]
[ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors]

Curbing.
Farnishing and setting, 2 by 14 inches .....
Furnishing and setting, 4-inch....
Furnishing and setting. 43 inch..
Furnishing and setting. 5-inch.
Furnishing and setting, 51-inch......
Furnishing and setting, 6-inch..
Furbisbidy and setting, 4-inch, circular ...
Furnishing and setting, 5-inch, circular.
Farnishing and setting, 6-inch, circular...
Setting, 2 by 14 inches ..........
Setting. 4-inch ........
Setting. 4-inch...
Setting. 5-inch ........
Setting. 54-inch....
Setting, 6-inch ....
Setting, 4-inch, circular ...
Setting 5-inch, circular .........
Setting. 6-inch, circular..
Dressing and jointing .........
Dressing only ....

[ocr errors]

............. per foot

....do..
....do....

..do.
.....do....
......do....

...do....
....do...
....do...

.. do...
....do...

do...
....do...
..do....

do....
.....do....
......do...
.....do...

do....
do..

[ocr errors]
[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

Flagging. Fardishing and laying, for crossings

........... per sq. foot. Furnishing and laying, 12-inch

........ per lin. foot. Furnishing and laying, 16-inch...

.........do.... Pelaying, 12-inch ....

.......do.... Relaxing, 16-inch ...

......do.... Grading and hauling. Ordinary excavation.

..............per ca. yard. First two feet of old gravel road-bed ........

....do.... Rock excavation.... All include a haul of 200 feet, and for every 100 feet over the first 200 feet....do...

.......do....

Graveling. Graveling ........

.............. per sq. yard. Parements.

[ocr errors][ocr errors][ocr errors][merged small][merged small]
[ocr errors]
[ocr errors]

Cobble-stone ....

............. per sq. yard.

49 Cobble-stope, relaying .........

...........do....

25. 9 This price has been allowed when contractors bave furnished the gravel at their own expense, or obtained the material from excavation, where they were obliged to handle it twice. Where gravel was hanled long distances, the rates for excavation and haul have been allowed, based upon the actual amount of gravel handled. Where obtained and paid for in excavation in one street and hauled upon another, no additional compensation has been given.

Board rates—Continued.

[graphic]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]

Excavation.
Excavation and refilling, to be measured in excavation only....... per cubie yard.
Excavation in made ground.....

.....do.... . Excavation 16 feet and over ....

............do...... Excavation of rock in trench.. Shoring .......

...per lin, foot.

Tile-pipe. Furnishing and laying 6-inch straight ..

. per lin. foot. Furnishing and laying 8-inch straight.

.do... Furnishing and laying 10-inch straight ... Furnishing and laying 12-inch straight .....

..do... Furnishing and laying 15-inch straight.....

...do.. Furnishing and laying 18-inch straight..

do Furnishing and laying 21-inch straight..

.do.. Furnishing and laying 24-inch straight.. Furnishing and laying 30-inch straight.

..do.... Furnishing and laying 12 by 6-inch branch...

...do... Furnishing and laying 12 by 12-inch branch...

....do...
Furnishing and laying 15 by 6-inch branch...
Furnishing and laying 15 by 12-inch branch.
Furnishing and laying 15 by 15-inch branch.

.do... Furnishing and laying 18 by 6-inch branch.

....do.. Furnishing and laying 18 by 12-inch branch..

..do.... Furnishing and laying 18 by 15-inch branch..

.do
Furnishing and laying 18 by 18-inch branch.
Furnishing and laying 20 by 6-inch branch..

.do....
Furnishing and laying 20 by 12-inch branch
Farnishing and laying 20 by 15-inch branch ..
Furnishing and laying 20 by 18-inch branch........

do....

do... Furnishing and laying 21 by 6-inch branch..

* Include two feet of grading.

[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors][ocr errors]
« AnteriorContinuar »