Imágenes de páginas
PDF
EPUB

Aug. 13, 1875 275
May 6, 1872 275

Commissioners' extension.

Resurface concrete pavement

..do

Cranford & Hoffman | 14, 494 39

178 66

Grade, set curbs, lay brick pavement, I st. n. w., bet. 15th and 17th and construct 12-inch-pipe sewer,

3 20

41, 592 52

[blocks in formation]

Cranford & Hoffman

6,300 07

108 85

Set curbs, lay brick pavement, park, 4th st., bet. N. Y. and Ind.

3 20

78, 709 63

[blocks in formation]

May 20, 1875 288
May 10, 1872 293

[blocks in formation]

Thomas Lewis and
D. F. Hamlink.
Surety: Thomas
A. Brown.
Commissioners' ex-
tension.

John O. Evans.
Sureties: J. H. Te-
meyer, Lewis Cle-
phane.
Oct. 30, 1875 293 Commissioners' ex-
tension.

[blocks in formation]
[blocks in formation]

Oct. 30, 1875 293 Commissioners' ex- Take up wood pavement for one or

[blocks in formation]
[blocks in formation]
[blocks in formation]

Bridge st., bet. Aqueduct and Market sts., George. town.

350

40,587 20

Extra work,

*Extra work, (water-services.)

29, 183 60

2,782 54

[graphic]

Expenditures for repair of contract-work under section 9 of the original contracts-Continued.

[subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][graphic][subsumed]

remaining in the wood pavement to be repaired with the sound blocks so removed.

[blocks in formation]

Grade, se t curbs, lay brick pavements, E st., bet. 7th and 10th sts.,
construct sewer laterals and water-
services, and lay Stowe wood pave-

ment.

Construct 12-inch sewer with man. holes and traps.

Take up blue stone pavement and lay
wood pavement.

Grade, set curbs, and construct 12-inch
sewers, withman-holes, traps, laterals,
and water-services.
Lay brick pavements

Lay Evans concrete pavement.
Resurface the concrete pavement.
Grade and set curbs.

[blocks in formation]

Aug. 13, 1875 408 Commissioners' ex- Resurface concrete sidewalks and cartension.

riage-way. *Extra work.

D. W.

[blocks in formation]

19th st., bet. E and F sts., n. w., and bet. H st. and Pa.

ave.

19th st., bet. E st. and Pa.

ave., n. w.

19th st., bet. F and G sts.,

n. W.

19th st., bet. E st. and Pa. ave., n. w., and bet. P st. circle and Boundary. .do

[blocks in formation]

20th st., bet. E st. and Pa. 3 20 ave., n. w.

20th st., bet. E st. and Pa. ave., n. w.

21st st., bet. E st. and Pa. 1 35 ave., n. w. 3 20

..do

[blocks in formation]
[graphic]

↑ Extra work to use surplus blocks.

Expenditures for repair of contract-work under section 9 of the original contracts-Continued.

[subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][graphic][subsumed][subsumed][subsumed]
[subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][merged small][merged small][subsumed][subsumed][subsumed][merged small][graphic][subsumed]
« AnteriorContinuar »