Imágenes de páginas
PDF
EPUB

TABLE NO. 3.-Contracts and extensions of board of public works, &c.—Continued.

[subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][merged small][subsumed][merged small][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][merged small][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][merged small][subsumed][merged small][subsumed][merged small][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][merged small][graphic]
[blocks in formation]

1

Measurement made by the engineer of the District of Columbia of work done under the board of public works by Samuel Barber, for resurfacing concrete pavement $11,385.25 was charged by the board of audit against the balance remaining to the credit of Charles E. Evans, president Evans Concrete Company. Voucher No. 41, measurement of work done under permit to C. F. E. Richardson, was originally issued for $459.97, which amount was subsequently increased, as per schedule forwarded to board of audit, to $764.82. The board of audit allowed both amounts in full, less $167.76 for inferior work, being an excess over engineer's measurement of $459.97.

Voucher 301.-$-10,492.04 reported to board of audit as over-measurement of contract 796 of board of public works. No action taken by board of audit.

Sundry additional credits allowed by board of audit, based upon other evidence than measurements of engineer, $8,668.67.

Total allowances of board of audit in excess of engineer's measurements of contracts contained in this table, $36,187.67.

Date.

Number of contract.

Names of contractors and sureties.

Description of work.

Name of street.

APPENDIX No. 9 C.-TABLE OF CONTRACTS OF BOARD OF PUBLIC WORKS.

Expenditures for repair of contract-work under section 9 of the original contracts.

[blocks in formation]
[blocks in formation]

C. E. Evans, presid't Lay Evans concrete pavement
Evans Concrete Co.

Sureties: Chas. E.
Evans and Martba
W. Evans.

39 Extension

[blocks in formation]

15th st., bet. Pa. ave. and H $3 20]
st., n. w.

Grade and lay Evans concrete pave- 15th st., bet. H st. n. w. and

[blocks in formation]

Vt. ave., at intersection of
K st., westwardly to the
building-line of Vt. ave.
Through Scott Square and on
- west side of Scott Square.
...do

[blocks in formation]
[blocks in formation]
[blocks in formation]

F st. n. w., bet. 18th and 22d sts.

G st. n. w., bet. 18th and 22d sts.

Aug.13, 1875 39 Commissioners' ex- Resurface concrete pavement..

[blocks in formation]
[blocks in formation]
[blocks in formation]
[blocks in formation]
[blocks in formation]
[blocks in formation]
[subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed]
[blocks in formation]

9th st., n. w., bet P st. and Boundary.

9th st., bet. Pa. ave. and P st., n. w.

3d st., n. w., bet. Ind. and N. 3 50) Y. aves.

3d st., n. w., bet. N st. and N. Y. ave.

Cranford & Hoffman. 82, 654 41

6, 263 33

5,245 81

7,332 27

[graphic]
[graphic][subsumed][subsumed]

Expenditures for repair of contract-work under section 9 of the original contracts-Continued.

« AnteriorContinuar »