APPENDIX No. 9 B.-TABLE OF CONTRACTS OF BOARD OF PUBLIC WORKS. TABLE No. 3.- Contracts and extensions of board of public works on which measurements haro bcon made under the direction of the engineer of the District of

Columbia at the request of the board of audit, the work having been completed under the board of publio works.

[ocr errors]

Sept. 18, 1871
May 11, 1872
Nov. 21, 1871
May 1, 1872
June 24, 1872
July 16, 1872

[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]

July 26, 1872

[ocr errors]
[ocr errors]

Aug. 12, 1872

[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[graphic]

TABLE No. 3.—Contracts and extensions of board of public works, fc.—Continued.

[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]

Oct. 18, 1872 578 F. L. Lamson. Grade, set curbs, lay footwalks, and 12-inch-pipe sewer, Corcoran st., bet. 13th and 14th sts., $2, 417 20 $1,542 57

with man-holes, traps, laterals, and water-services, n. W.

and round-block pavement.
Also a 12-inch-pipe sewer, with man-holes and traps, 13th st., bet. R and Corcoran sts., n. w.

397 91
on west side.
Oct. 18, 1872 592 John Chapman Lay 12-inch-pipe sewers in alleys, with man-boles and Square 424 .......

570 60 1,340 80
traps.
.do

Square 449..........

3, 021 71
..do

Square 425...

2, 961 42
Nov. 12, 1872 1095. D. A. Connolly.... Set curb and lay gutters on north side....

A st., bet. 6th and 7th sts., s. e...

9, 704 12 Nov. 14, 1872597 A. S. Richards Redressing and rejointing curb ...........

15, 495 71 285 30
Nov. 10, 1872 610 Albert Gleason.

Del. av., bet. I and K sts., n. e... 4,451 60 3, 488 60
Dec. 28, 1872 628 L. S. Filbert ... Set curbs and lay De Golyer No. 1 wood pavement.... N st., bet. 9th and 15th sts., n. w...
June 11, 1873 628 Extended.... To embrace sidewalks and parking.......

N st., bet. 11th and 12th sts., n. w.... 59, 427 26 3, 233 39
Lay 12-inch-pipe sewer on both sides of.....

N st., bet. 14th and 15th sts., n. w......
Jan. 4,1873 640 Finnegan & Nesdall. Grade, set curbs, and lay brick footwalks, park, lay L st., bet. 10th st. and N. J. ave., n. w.. 56, 104 29 1,629 18

12-inch-pipe sewer, with man-holee, traps, laterals,
and water-services, and lay Miller or Ballard wood

23, 277 26
pavement on carriage-way of-

-390 86

196, 325 06 22, 886 40
Jan. 14, 1873 641 Finnegan & Nesdall Grade, set curbs, lay footwalks, and park; also lay 12. 6th st., bet. L and Boundary sts., n. w.. 100, 843 20 224, 137 27

inch-pipe sewer with man-holes, traps, laterals, and
water-services on both sides; also lay Stowe, Miller,

or Ballard wood pavement on the carriage-way.
April 23, 1873 665 D. A. Connolly.... Grade and set curbs and lay brick foot walks ..... B st., bet. 2d and 4th sts., n. ..... 9 80 11,198 66
Grade alley .........

Square 758...
Aprl123, 1873 666 Albert Gleason. ... Grade and set curbs......

B st., bet. 12th and 17th st., n. w ...

11, 105 51
Grade......

E, st., bet. 10th and Water sts., 8. W... 17,765 25 61,514 42
Depositing surplus earth into, and to grade and level, Canal, bet. 7th and 17th sts., n. w...
and to sow grass-seed, and to remove all loose stone
from bridge abutments and canal walls, to be piled

up for future use. Mar. 20, 1573 690 D.A. Connolly.. Grade, not curbs, and lay foot walks....

Bst., bet. Del, av, and 23 st., n.o...

.... 5, 623 62 Sept. 28, 1873 l. . .

Amended to include setting ourbs and Inying foot walk B st., bet. 1st and 20 ste., D.O...

[ocr errors]
[ocr errors]
[ocr errors][ocr errors]

Lay footwalke, grade, and set curba ....

1st st., bet. B st. 1. and Bat.... Canceled so far as relates to......

1st st., bet. B and E. Capitol sts... Amended to include cutting down sidewalks on east 1st st., bet. A and B Bts., .........

side of 692 J. V. W. Vanden. Grade, set curbs, lay footwalks, sewer on........ 7th st., bet. I st. and N. Y. av., n.w. burgh.

Also grade K st., between 7th and 8th sts., and Mas. K st., bet. 7th and 8th sts., n. w ...

sachusetts avenue eastwardly from 7th st., to con

form to grade.
Extended...... Lay 12-inch-pipe sewer on north side.......

I st., bet. 7th and 8th sts., 1. w....
And take up and relay bluestone pavement..

I st., bet. 6th and 7th sts., n. w...
...do ...

Amended to include grading, setting curbs, and lay- 7th st., bet. D and Ests., n. w.

ing water-services.
And grading, setting curbs, laying footwalks, sewer. 7th st., bet. G and Msts., n. w..

laterals, and water-services.
And laying footwalks......

7th st., bet. G and N. Y. av., n. w....
700 Andrew Gleason ... Grade, set curbs, lay brick footwalks, and blue-rock H st., bet. 1st and Boundary sts., n. e.

pavement.
Also to take up and remove blue-rock pavement from.. F st., bet. 7th and 9th sts., n. w.......
f And use the same for H st. n. e......

Square 858..

[ocr errors][ocr errors][ocr errors]
[ocr errors][ocr errors][merged small][ocr errors][ocr errors]

328, 469 21 54, 648 56 383, 117 77
Mar. 21, 1873 703 Albert Gleason.. Grade, set curbs, and lay brick footwalks and park... R. I. ave., bet. 14th and 16th sts., n.w.. $7, 253 00 $1,505 01 $8,758 01
June 4, 1873 708
Grade ...

C st., bet. 13th and 15th sts., 8. W... 1, 325 52 645 68 1,971 20
.do
10th st. bet. F and Water sts., 8. W... 1,623 00

1, 623 00
..do

I st., bet. 7th and 9th sts., 8. w...... 5, 459 22 9,023 28 14, 482 50
.... do.

Square 212....

19, 600 00 8, 468 60 28,068 60
June 25, 1873 730 D. McNamara.. Set curbs and lay footwalks ...

I st., bet. North Capitol and 1st sts., n.
Sept. 6,1873 730
Canceled so far as relates to setting curbs, and lay ...... do ....

{ 2,022 29

1,181 70 3, 203 99
foot walks on south side.
Sept. 8, 1873 730 Extended ... To embrace setting curb and laying footwalks on 1st st., bet. I and K sts.......

1,377 46

1,377 46
west side.
July 7, 1873 738 H. L. Gallagher,(Gal. Lay 12-inch-pipe sewer, with man-holes, traps, and 10th st., bet. R. I. ave. and R st., n. w.. 639 38

639 38
lagher & Co.)

laterals.g
And a 12-inch-pipe sewer in alley ..........

Square 364....

h1, 312 99 1,312 99
a Excess of audit over engineer's measurement. 8962.58.

6 Excess of audit over engineer's measurement, $1,554.81.
c The work of filling Washington Canal was placed by the board of audit to the account of miscellaneous work and not to contract 666. The entries in the book of the
board of audit are as follows, viz:
December 21, 1871, paper 50 .........

$1, 233 50
April 29, 1872, paper 1353.....

472 30
May 21, 1873, paper 1797.....

1, 356 20
June 12, 1873, paper 1935 and 1936.....

28, 000 00
July 17, 1873, paper 2128.....

12, 762 00
September 3, 1873, paper 2799 ....

25, 000 00
Total ..

68, 824 00
d Included in item of $49,899.47 below. e Excess of audit over engineer's measurement, $7,586.47. f Order of November 21, 1873. Not mentioned in written contract.
g This sewer was laid through square 336, (alley,) instead of on the street.

h Excess of audit over engineer's measurement, 26 cents.

[graphic]

.

.

.

.

.

..

.

.

.

..

..

..

.

...

.

.

.

..

.

...

.

...

.

..

.

.

.....

.

.

.

.

.

do ..

........

..........................

[graphic]

TABLE No. 3.-Contracts and extensions of board of public work8, 80.—Continued.

[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors][subsumed][ocr errors][ocr errors][subsumed][ocr errors][subsumed][subsumed][subsumed][ocr errors]

Construct 3-ring brick barrel-sewer, 10 feet inside

diameter, from east side of 15th st., n. e., opposite G
st., n. e, along natural water-course, through Isher-

wood Farm to the Eastern Branch.c
Grade, set curbs, lay brick footwalks, and blue-rock

pavement.
Amended to lay 15-inch-pipe sewer with man-holes

and traps, on south side.
To construct an alley-drop at the "T," near 4 st..
and to be connected with 41 st.

[ocr errors]
[ocr errors][ocr errors][ocr errors][subsumed]
[graphic]
[ocr errors]

Sept. 18, 1873 837

Amended to say 19-inch-pipe sewer on south aide ...... st., bet. 3d and 44 sts., 8. W....
Sept. 23, 1873

Amended to lay 15-Inch-pipe sewer and cancel so much ist., bet. 6th and 7th st., 8. W.

as relates to paving carriage-way of said street,

(work embraced in contract No. 908.)
Ang. 16, 1873 858 Richard Morgan .... Reset curbs and relay brick footwalks..

5th st., bet. Pa, and Md. aves., n. e... 1,634 34 8,293 32 9,927 66
Lay brick footwalks 10 feet wide, terrace and park, C st., bet. 2d and 3d sts., n.o....

1,874 18

1, 874 18
and lay 12-inch-pipe sewer, with necessary man-holes

and traps.
May 17, 1874 858 Extended ..... Lay 18-inch-pipe sewer......

B st, bet. 5th and 6th sts., 8. e...

675 17

675 17
Sept. 1, 1873 884 William Buckley ... Construct an 18-inch-pipe sewer, with man-holes and School st., bet. 41 and 6th sts., 8. W. 1, 819 27

1, 819 27
traps.
An 18-inch-pipe sewer on west side, with man-holes 4 st., bet. E and School sts., 9. w..

764 16

764 16
and traps.
A 12-inch-pipe sewer, with man-holes and traps, on D st., bet. 6th and 7th sts., 8. W .....

north side.
A 12-inch-pipe sewer, with man-holes and traps, on ......do .....

south side.
Take up 12-inch-pipe sewer and reconstruct said 6th st., bet. D and School sts., S. W ..... 903 18 1,225 49 2, 128 67

sewer on 6th st., bet. D and School st., s.w., with

grade falling to School st.
Sept. 15, 1873 834

Amended to include 12-inch-pipe sewer on north side. D st., bet. 6th and 7th sts., 8. w....
12-inch-pipe sewer on south side .....

D st., bet. 6th and alley, in square 465
Sept. 13, 1873 898 James Nelson....... Grade and pave alloy with cobble-stone...

Square 277....

633 22 633 22

59,914 05 39,555 58 99, 469 63
Sept. 19, 1873 1 904 M.J.1
Grade south half....

Pa. ave., bet. 1st and 2d sts., 8. e...
904
Sept. 23, 1873

6,905 64
Amended to embrace grading north balf..
Pa, ave., bet. 1st and 2d sts., 8. ...

4,790 80 11, 696 44
......do .......
Sept. 23, 1873 907 Joseph Williams. Lay 12-inch-pipe sewer, with two drops, in alley.. Square 465....

918 20 918 20
Oot. 3, 1873 915 Z. Jones ..
Lay Taylor and Filbert wood pavement...
6th st., bet. Pa. and S. C. aves., 8. m.

612 72 612 72
F st., bet. 1st and 2d sts., n. w ..... 6,574 40

6,574 40
.....do..

D st., bet. 6th and 7th sts., n. w ....
1st st., bet. B and C sts., n. ...

{16, 096 55

16, 096 55

1st st., bet. B and C sts., 8.8.....
Oct. 25, 1873.

Amended to lay Taylor and Filbert wood pavement. C st., bet. 1st and N. J. ave., n. w..

Cancels so much of contract No. 761 as relates to

the work.
Oct. 8, 1873 9260 P. MoNamara.. To complete work. (Cancels contract 775)............ Good Hope Hill....

15, 995 28 7, 388 81 23, 384 09
Oct. 13, 1873 936 M.J. Laughlin... Set curbs and lay foot walks ...

1st st., bet. B and C sts., 8. e..

3,784 42 3,784 42
Nov. 1, 1873 958 George F. Rider .... Lay 12-inch-pipe sewer, with man-boles and traps, in Square 630 ...

432 84

432 84 alley. Dec. 9, 1873 996 John F. Murray. Terrace and park...

3d st., bet. E. Cap. and Md. ave..

301 77

301 77
Dec. 11, 1873 999e Charles Stewart ... Lay cobble-stone pavement....

Dunbarton st., bet. Congress and High

3,013 41

3, 013 41

sts., Georgetown.
Dec. 15, 1873 1003 P. W. Doyle.... Lay a 12-inch-pipe sewer, with man holes, traps, and Square 365.....

739 76 1, 095 92 1, 835 68
laterals, in alley..
Jan. 15, 1874 1020 S. C. Wroe .......... Drain square 157 by laying a 24-inch gewer to connect Square 157.......

755 55 755 55
near the intersection of Massachusetts avenue and
Seventeenth street, northwest, with main Slash Run

sewer.
a Audited by board of audit to J. V. W. Vandenburgh & Co.

Excess of andit over engineer's measurement, $755.25.

c Boundary-street sewer, d Excess of audit over engineer's measurement, $5,599.19.

e Excess of audit over engineer's measurement, $3.13.

« AnteriorContinuar »