Imágenes de páginas
PDF
EPUB
[blocks in formation]

Apr. 17, 1874 1063 George Follansbee Lay 12-incb-pipe sewer with G st., bet. 10th and 11th sta.,

manholes, traps, and water-1 S. .

services on north side. * Necessary outlet for G-street 10th st., 8. w..................)

sewer on Apr. 20, 1874 1064 | M. F. Reese ...... Construct 12-inch-pipe sewer Alley in square 366...........

with man-holes and traps.
do.

Alley in aquare 515........ Apr. 21, 1874 1070 Dennis Niland.... Park and lay brick leads...... 19th st., bet. P-st. circle

Boundary st., n. W. Apr. 25, 1874 1072 William Dayton .. t Construct a two-ring brick D st., from east side of 8th to

barrel-sewer, 3 feet inside 7th st., s. e.

diameter, south side. Construct a two-ring brick 7th st., bet. D and I sts., s. e.. barrel-sewer, 3 feet inside

diameter, east side ofConstruct a 12-inch-pipe sewer 7th st., bet. D and G sts, s. e..

on north side. All with

man-boles and traps, Apr. 29, 1874 1074 Albert Gleason .. Grade, reset curbs, and relay st., bet. 7th and 8th sts., D.

brick pavements. Sept. 29, 1875 1074 Commissioners'ex Grade, set curbs, lay brick IQ st., bet. 12th and 14th sts.,

tension.

pavements, and construct D. W.

necessary sewers. Aug. 27, 1875 1074 ....do ......... Grade, set curbs, lay brick 12th st., bet. P-st. circle and

pavements, and construct Q st., n. w.

12-inch-pipe sewers. Sept.29, 1875 1074 .... do ......... Grade, set curbs, lay brick Vt. ave., bet. P-st. circle and

pavements, and construct Q st., n. w.

sewers. Grade, set curbs, lay brick 13th st., bet. P-st. circle and

foot walks, and construct Q st., n. w.

sewers May 22, 1874 1084 | Charles Schroth .. Set curbs and lay cobble-stone | D st., bet. 6th and 7th sta, se.

pavement. June 12, 1874 1084 Extension, board Construct 12-inc

of public works. on north side.
May 23, 1874 1086 | John H. Clarke.. Grade, lay cobble-stone pave. Alley in square 312.....

ment, and construct 12-inch-
pipe sewer with man-holes,
traps, and drops in--
.do....................

Alley in square 337...
May 23, 1874 10877| Charles Stewart ........do .................... Alleys in squares 368 and 279
Feb. 8, 1875 1087 | Commissioners'ex. Complete the grading, cobble. Alley in square 279........

tension, Charles stone-paving, and laying of
B. Fisher.

12-inch-pipe sewer, with
man holes, traps, and drops,
under article 5 of the above-

mentioned contract, inMay 28, 1874 1088 Charles Stewart .. Construct 12-inch-pipe sewer, Alley in square 728..........

with man-holes and traps in Jane 6, 1874 1091 R. E. Boston ..... Construct 12-inch pipe gewer, Alley in square 248..........

with man-holes and drops in

30 foot. June 9, 1874 1094 Albert Gleason ... Grade, set curbs, lay brick 15th st., bet. R. I. are and

pavements, park, coustruct Boundary, n. w.
12-inch-pipe sewer, with man-

holes and traps. Aug. 27, 1875 1094: Commissioners'ex. Take up and relay 15-inch. 15th st., bet. S and T sta., n. . tension.

pipe sewer. May 20, 1875 1094 Commissioners'ex. Grade, set curbs, lay brick Corcoran st., bet14th and 16th tension.

pavements, and construct sts., n. w.

sewers. * Paper 4448 and 5016. E. O., 1874. +$1,137.55 additional was expended in the repair of the work and deducted from measurement

wer

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][ocr errors][ocr errors][ocr errors][merged small][ocr errors][ocr errors][ocr errors][ocr errors][merged small][ocr errors][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][ocr errors][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][ocr errors][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

May 20, 1875 1094 Commissioners' ex- Grade, set curbs, lay brick R st., bet. 14th and 16th sts., n. tension,

pavements, and construct w. sewers. Grade, set curbs, lay brick Sampson st., bet. 15th and 16th

pavements, and construct Sts., n. w. sewers. Grade, set curbs, lay brick '17th st., bet. Mass. ave. and R pavements, and construct st., n. w.

sewers. Grade, set curbs, lay brick Q st., bet. Mass. ave. and 16th

pavements, and construct st., n. w.

sewers. Aug. 27, 1875 1094 Commissioners' ex. Construct 12-inch-pipe sewer.. Pst., bet. 14th st. and King. tension.

man's court, n, w. * Set curbs and lay brick pave. 17th st., bet. P and Qsts., n. w.

ments. June 16, 1874 10971 Allan Chappelle... Construct a 24-inch-pipe sewer, 7th st., bet. G and I sts., n. e...

with man-holes and traps on

east side of June 19, 1874 1098 A.C. Chenowith... Construct a two-ring brick 10th st., bet. R and T sts., n. w.

barrel-sewer, 3 feet inside
diameter.
Construct a two-ring brick T st., bet. 10th and 13th sts.,
barrel-sewer, 2 feet inside n. w.

diameter. Sept. 28, 1875 1098; Commissioners'ex. Repair sewer, (under ninth sec. T st., bet. 10th and 13th sts.,

tension. (Patrick' tion of aforesaid contract.) n. w.
Brennan.)

Sewer in ...................... Square 237............... June 20, 1874 (1099 J. V. W. Vanden. | Take upiron railing and coping B st., bet. 6th and 17th sts., n. burgh.

around Capitol grounds, and w.
remove and erect the same

ON

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][ocr errors][ocr errors][ocr errors][merged small]

* Included in above item of $8,207.58. Extra work, 5391, Engineer's Office, 1874.

Included in above item of $15,538.95, being deducted from the amount due the contractor.

[ocr errors]

RECAPITULATION.
Estimated cost of completion of improvement......
Work done by board of public works, as audited by board of audit...
Work done by the Commissioners, as audited by board of audit:

On contracts and extensions of board of public works ...,

On extensions of the Commissioners, involving new work... Measurement of all additional work completed up to March 22, 1875.....

[ocr errors]

Total expenditures......................
Excess of audit over engineer's measurement.............................

[ocr errors]

Foot-note No. 1 to Table No. 2. * Canceled in accordance with the following

CIRCULAR-LETTER TO ALL CONTRACTORS.

ENGINEER'S OFFICE, DISTRICT OF COLUMBIA,

Washington, September 30, 1875. SIR: I am directed by the commissioners of the District to notify you that they are of the opinion that the work under your contract with the late board of public works, No.- is unnecessarily delayed, and that they will consider it as continuing to be unnecessarily delayed unless the contract shall have been entirely performed on or before the first day of November, 1875, and that, if it shall not have been entirely performed on or before that day, the Commissioners will, pursuant to the fifth clause of said contract, discontinue the work thereunder, or place such and so many persons as may be deemed ad viss ble, by contract or otherwise, to work at and complete the work described in said contract or any part thereof, and use such materials as may be found on the line of said work, or to procure other materials for the completion of the same, and to charge the expense of said labor and material to you. .

R. L. HOXIE, Lieutenant Engineers, U. S. A., Engineer District of Columbia. To

CIRCULAR-LETTER TO ALL CONTRACTORS.

ENGINEER'S OFFICE, DISTRICT OF COLUMBIA,

Washington, February 3, 1876. SIR: Yon are hereby directed to suspend work under contract No.-, with the late board of public works, and the extension thereof with the Commissioners of the District of Columbia, as successors of said board. If said contract, or the extensions thereof, have not been completed within the time limited by its terme, or is forfeitable for non-performance of any other condition thereof, the said Commissioners hereby expressly reserve their right to hold said contract or extensions violated and forfeited. By order of the Commissioners of the District of Columbia, successors to the board of public works.

R. L. HOXIE, Lieutenant Engineers, U. S. A., Engineer District of Columbia.

To —

EXTRACT FROM JOINT RESOLUTION APPROVED MARCH 14, 1876. "Provided, That any further issue of 3.65 bonds under or by virtue of said act of Congress approved June 20, 1874, is hereby prohibited; and provided, that the said Commissioners are hereby directed to discontinue all work and labor on streets, avenues, bridges, sewers, capa the payment for which is to be made in 3.65 bonds of the District of Columbia."

Circular-letter addressed to contractors under date of March 22, 1876, citing the above-mentioned joist resolution and declaring canceled all unfinished contracts.

Foot-note No. 2 to Table No. 2. + Estimated cost of completion dating from June 20

stimated cost of completion dating from June 20. 1874, of contracts and extensions of the board of public works which were incomplete at that time, and which have been recognized as being then existing legal obligations, in accordance with the general plans of the board of public works, together with the work then required to complete the improvements in accordance with these plans upon the streets and within the limits covered by these contracts.

« AnteriorContinuar »