Apr. 17, 1874 1063 George Follansbee Lay 12-inch-pipe sewer with

[blocks in formation]

manholes, traps, and waterservices on north side. *Necessary outlet for G-street

sewer on

Construct 12-inch-pipe sewer with man-holes and traps.

do Park and lay brick leads.

Construct a two-ring brick barrel-sewer, 3 feet inside diameter, south side. Construct a two-ring brick barrel-sewer, 3 feet inside diameter, east side ofConstruct a 12-inch-pipe sewer on north side. All with man-holes and traps. Grade, reset curbs, and relay brick pavements. Grade, set curbs, lay brick pavements, and construct necessary sewers. Grade, set curbs, lay brick pavements, and construct 12-inch-pipe sewers. Grade, set curbs. lay brick pavements, and construct

sewers.

Grade, set curbs, lay brick footwalks, and construct

sewers.

Set curbs and lay cobble-stone pavement.

Construct 12-inch pipe-sewer on north side.

G st., bet. 10th and 11th sts.,

8. W.

10th st., s. w............

Alley in square 366...

Alley in square 515. 19th st., bet. P-st. circle and Boundary st., n. w.

D st., from east side of 8th to 7th st., s. e.

7th st., bet. D and I sts., s. e..

7th st., bet. D and G sts, s. e..

Q st., bet. 7th and 8th sts., n. w

Q st., bet. 12th and 14th sts,

D. W.

12th st., bet. P-st. circle and Q st., n. w.

Vt. ave.. bet. P-st. circle and Q st., n. w.

13th st., bet. P-st. circle and Q st., n. w.

D st., bet. 6th and 7th sts., s. e.

....do........

Grade, lay cobble-stone pave- Alley in square 312...
ment, and construct 12-inch-
pipe sewer with man-holes,
traps, and drops in--

...do

...do

Complete the grading, cobble. stone-paving, and laying of 12-inch-pipe sewer, with man-holes, traps, and drops, under article 5 of the abovementioned contract, in

Charles Stewart.. Construct 12-inch-pipe sewer,

R. E. Boston

Albert Gleason

tension.

Commissioners' exCommissioners' ex

[blocks in formation]

with man-holes and traps inConstruct 12-inch pipe sewer, with man-holes and drops in 30 foot.

Grade, set curbs, lay brick pavements, park, construct 12-inch-pipe sewer, with manholes and traps. Take up and relay 15-inchpipe sewer. Grade, set curbs, lay brick pavements, and construct

sewers.

Alley in square 337.
Alleys in squares 363 and 279
Alley in square 279..

Alley in square 728. Alley in square 248...

15th st., bet. R. I. are, and Boundary, n. w.

15th st., bet. S and T sts., . . Corcoran st., bet. 14th and 16th

sts., n. w.

+81,137.55 additional was expended in the repair of the work and deducted from measurement.

[blocks in formation]
[blocks in formation]

May 20, 1875 1094 Commissioners' ex- Grade, set curbs, lay brick R st., bet. 14th and 16th sts., n.

[blocks in formation]

pavements, and construct W.

[blocks in formation]

June 16, 1874 1097 Allan Chappelle... Construct a 24-inch-pipe sewer,

June 19, 1874 1098

with man-holes and traps on east side of

st., n. w.

Q st., bet. Mass. ave. and 16th st., n. w.

P st., bet. 14th st. and King. man's court, n. w.

17th st., bet. P and Q sts., n. w.

7th st., bet. G and I sts., n. e...

A. C. Chenowith... Construct a two-ring brick 10th st., bet. R and T sts., n. w. barrel-sewer, 3 feet inside

[blocks in formation]
[blocks in formation]

+ Extra work, 5391, Engineer's Office, 1874.

Included in above item of $15,538.95, being deducted from the amount due the contractor.

RECAPITULATION.

Estimated cost of completion of improvement..
Work done by board of public works, as audited by board of audit.
Work done by the Commissioners, as audited by board of audit:
On contracts and extensions of board of public works
On extensions of the Commissioners, involving new work..
Measurement of all additional work completed up to March 22, 1875.

[blocks in formation]

$418, 292 27 74, 941 93

316, 124 24

238, 010 74 4,799 91

633,876 87 2,126 40

Foot-note No. 1 to Table No. 2.

* Canceled in accordance with the following

CIRCULAR-LETTER TO ALL CONTRACTORS.

ENGINEER'S OFFICE, DISTRICT OF COLUMBIA,
Washington, September 30, 1875.

SIR: I am directed by the commissioners of the District to notify you that they are of the opinion that the work under your contract with the late board of public works, No.-, is unnecessarily delayed, and that they will consider it as continuing to be unnecessarily delayed unless the contract shall have been entirely performed on or before the first day of November, 1875, and that, if it shall not have been entirely performed on or before that day, the Commissioners will, pursuant to the fifth clause of said contract, discontinue the work thereunder, or place such and so many persons as may be deemed advisable, by contract or otherwise, to work at and complete the work described in said contract or any part thereof, and use such materials as may be found on the line of said work, or to procure other materials for the completion of the same, and to charge the expense of said labor and material to you. R. L. HOXIE, Lieutenant Engineers, U. S. A., Engineer District of Columbia.

To

CIRCULAR-LETTER TO ALL CONTRACTORS.

ENGINEER'S OFFICE, DISTRICT OF COLUMBIA,
Washington, February 5, 1876.

SIR: You are hereby directed to suspend work under contract No.-, with the late board of public works, and the extension thereof with the Commissioners of the District of Columbia, as successors of said board. If said contract, or the extensions thereof, have not been completed within the time limited by its terms, or is forfeitable for non-performance of any other condition thereof, the said Commissioners hereby expressly reserve their right to hold said contract or extensions violated and forfeited. By order of the Commissioners of the District of Columbia, successors to the board of public works. R. L. HOXIE, Lieutenant Engineers, U. S. A., Engineer District of Columbia.

Το

EXTRACT FROM JOINT RESOLUTION APPROVED MARCH 14, 1876.

"Provided, That any further issue of 3.65 bonds under or by virtue of said act of Congress approved June 20, 1874, is hereby prohibited; and provided, that the said Commissioners are hereby directed to discontinue all work and labor on streets, avenues, bridges, sewers, canals, and structures of every kind, the payment for which is to be made in 3.65 bonds of the District of Columbia."

Circular-letter addressed to contractors under date of March 22, 1876, citing the above-mentioned joint resolution and declaring canceled all unfinished contracts.

Foot-note No. 2 to Table No. 2.

Estimated cost of completion dating from June 20, 1874, of contracts and extensions of the board of public works which were incomplete at that time, and which have been recognized as being then existing legal obligations, in accordance with the general plans of the board of public works, together with the work then required to complete the improvements in accordance with these plans upon the streets and within the limits covered by these contracts.