240,000 CO 233, 864 40 198, 509 33 233, 864 40 Board estimate for completion as being existing legal obligations on June 20, 1874, &c.—Continued. $17,000 00 $76, 195 00 $122, 222 43 $11, 500 12 On contracts and ex- On extensions of Com- 36, 031 46 36,031 46 Complete. TABLE NO. 1.-Contracts and extensions of board of public works recognized Name of contractor. Description of work. Location. Lay 12-inch and 15-inch-pipe Q st., bet. 6th and 9th sts., n. w Lay 12-inch pipe sewer, with Lay 15-inch pipe sewer, with Lay 12-inch and 15-inch-pipe Lay 12-inch-pipe sewer, with ..do Lay 12-inch-pipe sewer, with Lay 12-inch-pipe sewer, with Aug. 9, 1875 835 Commissioners' ex- Lay 12-inch-pipe sewer Lay brick pavements on north Grade, set curbs, and lay brick } (January 26, 1876, canceled. Construct sewer in. P st., bet. 6th and 11th sts., n. Square 272 .do Square 441 and outlet F st., bet. 6th and 7th sts., n. w bet. Congress & Washington sts., Georgetown. Beall st., bet. High and Washington sts., Georgetown. Beall st., bet. Green and Washington sts., Georgetown. Beall st., bet. Green and Monroe sts., Georgetown. Fayette st., between 1st and Boundary st., bet. 2d and 11th .do. Set curbs and lay brick pave- Boundary st., bet. 6th and 9th ments. Gravel † Work done by W. H. Mohler. sts, n. e. + Square 423. TABLE NO. 1.--Contracts and extensions of board of public works recognized Name of contractor. Description of work. Location. Sept. 25, 1874 836 Commissioners'ex tension. May 20, 1875 836....do Construct a 3-ring brick barrelsewer, 7 feet inside diameter, along Brentwood road, be tween Boundary street and intersection of Tiber Creek for a distance northwestwardly of one thousand feet, more or less, and construct a 2-ring brick barrel-sewer on Boundary street, between Brentwood and Gales's Creek. Construct a 3-ring brick barrelsewer at such points along Gales's Creek as may be necessary, in order to complete the grading in that section of the city, between Boundary and K streets north, and Second and North Capitol streets east; also, construct a gravelpit and inlet for the same. Aug. 12, 1873 838 Ballard Paving Co. Grade, set curbs, lay brick Georgetown, D. C . pavements and wood pavement on Bridge street from a point 250 feet from the west building-line of High street to Market street. Lay brick pavements on Bridge street from a point 250 feet west of High street to High street. (Under this contract brick pavements were left unfinished by consent of board of public works.) Construct sewers and lay Belgian pavement on the carriage-way. (See extension of July 6, 1875.) Aug. 12, 1873 838 Ballard Paving Co. Grade, set curbs, lay brick and wood pavements. (Work had been assessed as if completed.) Complete the grading, setting curbs, and laying brick pave *Not mentioned in contract. |