Table No. 1.- Contracts and extensions of board of public works recognized Aug. 2, 1873 811 Campbell & Roth- Construct 2-ring brick barrel 7th st., bet. Md. ave. and G st., well-Continued. Bewer, 3 feet 6 inches inside diameter, on east side of, (all both sides. May 5,1875 811 Commissioners' ex- Lay 12-inch-pipe sewer, with A st., bet. 6th and 7th sts., s. e tension. map-holes and traps. June 1, 1875 811 ... do Lay 2 ring brick sewer Mass. ave., bet. 8th and 9th sts., n. e. Lay 15-inch-pipe sewer. Mass., ave., bet. 9th and 10th sts., n. e. Lay 12-inch-pipe sewer, (all Mass. ave., bet, 10th and 11th with man-holes and traps.) sts., n. e. Lay 15-inch-pipe sewer, with 8th st., bet. East Capitol st. man-holes and traps. and Mass. ave. Lay 12-inch-pipe sewer, with 9th st., bet. East Capitol st. man-holes and traps. and Mass. ave. Sept. 4,1875 811 Commissioners' ex. Lay 12-inch pipe sewer, west 9th st., bet. East Capitol st. tension. side. and B st., n. e. June 1, 1875 811 ....do Lay 12-inch-pipe sewer, with 10th st., bet. East Capitol st. man-boles and traps. and Mass, ave. do... A st., bet. 2d and 4th sts., n. e.. Aug. 11, 1875 811 Commissioners' ex. Lay 12-inch-pipe sewer in alley Square 786 tension. in- B st., bet. 2d and 3d sts., n. e... Aug. 4, 1873 818 Jos. F. Hodgson ... Grade...... 19th st., bet. East Capitol st. and Ga. are Aug. 4, 1873 819 Andrew Gleason .. Grade, set curbs, lay brick 4th st., bet. Mass. ave. and E pavements, lay 12-inch-pipe st., p. e. riage-way. May 19, 1875 819 Commissioners' ex- Grade. 4th st., bet. E and Boundary tension. Sts., n. e. July 15, 1875 819 ... do Set curbs and lay brick foot. G st., bet. 9th st. and Mass. ave walks. July 31, 1875 819 ...do Grade, set curbs, lay brick 5th st., bet. Q and Boundary pavement, and lay 12-inch sts., D. W. pipe sewer. Nov. 30,1875 819t....do Grade, set curbs, lay brick M st., bet. North Capitol and pavement, cobblestone gut- 1st sts., D. e. Square 628 Sept. 2?, 1875 819 Commissioners' ex- Lay pipe-suwers for the drain. Squares 675, 676, and 677, I st., tension. age 01 - with man-holes and drops, in alley. Aug. 7,1873 205 Stephen Talty.... Grade, set curbs, lay cobble-M st., bet. N. Cap. and Bound. stone, gutters, lay brick pave- ary sts., n. e. been given.) * Extra work, C065, E. O. 1875. See fout-note No. 1. Extra work €408, 8906, E009, and 11255, E. 0. 1975. as being existing legal obligations on June 20, 1874, 8c.—Continued. & All claims under this contract, except payment of balance due, extinguished by terms of contract No. 27, dew series, dated May 29, 1876. TABLE No. 1.-Contracts and extensions of board of public works recognized Sept. 17, 1875 826 Commissioners'ex. Grade, set curbs, and lay brick K st., bet, 31 and 7th sts., n. e. tension. pavements. Dec. 3, 1875 826 .....do Lay flag footwalks, cobble K st., bet. 3d and 7th sts., n. e.. stone gutters, and gravel the roadway. sewer, 9 feet inside diameter, Boundary street. tension, William 13 feet inside diameter, ac- ginning at a point near the section 5 of contract.) liams. 10 feet radius, on stone invert along North Capitol street, from E to O streets, northwest. Sewer laid under contract 559 C st., bet. 3d and 44 sts., n. w.. in the year 1872, onAug. 12, 1873 833 Dennis Nalley.... Grade, set curbs, lav brick 4th st, bet. N. C. ave. and Po pivement and bluestone tomae river. pavement. Lay 12.inch-pipe sewers, with 4th st., bet. N. C. ave. and E man holes and traps, on both st., 8. e. sides of Lay 1-inch-pipe sewer, with 4th st., bet. Est. and S. C. ave., man holes and traps, on west side of Lay 15-inch-pipe sewer, with 4th st., bet. S. C. ave, and Va. man-boles and traps, on both ave. sides of Lay 18.11 ch-pipe sewer, with 4th st., bet. Va. ave, and I st., man-holes and traps, on west side of Lay 18-inch-pipe sewer, with I st., bet. 3d and 4th sts., B. e.. |