TABLE NO. 19.-Detailed cost, terminal facilities, Balboa, to June 30, 1915-Contd.

[blocks in formation]

TABLE NO. 19.-Detailed cost, terminal facilities, Balboa, to June 30, 1915-Contd.

[blocks in formation]

TABLE NO. 19.-Detailed cost, terminal facilities, Balboa, to June 30, 1915-Contd

[blocks in formation]

NOTE.

1,146. 32
2, 563. 45

8, 115.31

43, 662.64

55, 487.75

7,933. 40

241, 557.23

11.24

21.54

46.82

79.60

211,636.83

10, 539, 935. 69

This statement does not include the cost of the Panama Railroad concrete dock, $389,314.69, and the balance of construction plant and equipment, $109,558.23, to be absorbed in the various units of construction as the work progresses.

TABLE NO. 20.-Detailed cost, permanent townsites, to June 30, 1915.

[blocks in formation]

TABLE NO. 21.-Detail of " Buildings" to June 30, 1915-Continued.

[blocks in formation]

TABLE NO. 22.-Detailed cost, new Panama water system to June 30, 1915.

[blocks in formation]

Preliminary investigations, surveys and borings prior to June 30, Cubic yards.

1913.

$4,130. 08

[blocks in formation]