Imágenes de páginas
PDF
EPUB

suance of this permit unless otherwise specified) and is not completed on or before day of 19-, (three years from the date of issuance of this permit unless otherwise specified) this permit, if not previously revoked or specifically extended, shall automatically expire.

(p) That this permit does not authorize or approve the construction of particular structures, the authorization or approval of which may require authorization by the Congress or other agencies of the Federal Government.

(q) That if and when the permittee desires to abandon the activity authorized herein, unless such abandonment is part of a transfer procedure by which the permittee is transferring his interests herein to a third party pursuant to General Condition S hereof, he must restore the area to a condition satisfactory to the District Engineer.

(r) That if the recording of this permit is possible under applicable State or local law, the permittee shall take such action as may be necessary to record this permit with the Register of Deeds or other appropriate official charged with the responsibility for maintaining records of title to and interests in real property.

(s) That there shall be no unreasonable interference with navigation by the existence or use of the activity authorized

herein.

(t) That this permit may not be transferred to a third party without prior written notice to the District Engineer, either by the transferee's written agreeement to comply with all terms and conditions of this permit or by the transferee subscribing to this permit in the space provided below and thereby agreeing to comply with all terms and conditions of this permit. In addition, if the permittee transfers the interests authorized herein by conveyance of realty, the deed shall reference this permit and the terms and conditions specified herein and this permit shall be recorded along with the deed with the Register of Deeds or other appropriate official.

II. Special Conditions: Here list conditions relating specifically to the proposed structure or work authorized by this permit. The following Special Conditions will be applicable when appropriate:

Structures In or Affecting Navigable Waters of the United States

(a) That this permit does not authorize. the interference with any existing or proposed Federal project and that the permittee shall not be entitled to compensation for damage or injury to the structures or work authorized herein which may be caused by or result from existing or future operations undertaken by the United States in the public interest.

(b) That no attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the activity authorized by this permit.

(c) That if the display of lights and signals on any structure or work authorized herein is not otherwise provided for by law, such lights and signals as may be prescribed by the United States Coast Guard shall be installed and maintained by and at the expense of the permittee.

(d) That the permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the authorized structure or work, shall, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the waterway to its former conditions. If the permittee fails to comply with the direction of the Secretary of the Army or his authorized representative, the Secretary or his designee may restore the waterway to its former condition, by contract or otherwise, and recover the cost thereof from the permittee.

(e) Structures for Small Boats: That permittee hereby recognizes the possibility that the structure permitted herein may be subject to damage by wave wash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to insure the integrity of the structure permitted herein and the safety of boats moored thereto from damage by wave wash and the permittee shall not hold the United States liable for any such damage.

[blocks in formation]

(d) That the discharge will not occur in a component of the National Wild and Scenic River System or in a component of a State wild and scenic river system.

Dumping of Dredged Material Into Ocean

Waters

(a) That the dumping will be carried out in conformity with the goals, objectives, and requirements of the EPA criteria established pursuant to Section 102 of the Marine Protection, Research and Sanctuaries Act of 1972, published in 40 CFR 220228.

(b) That the permittee shall place a copy of this permit in a conspicuous place in the vessel to be used for the transportation and/or dumping of the dredged material as authorized herein.

This permit shall become effective on the date of the District Engineer's signature.

Permittee hereby accepts and agrees to comply with the terms and conditions of this permit.

(Permittee)

(Date)

By authority of the Secretary of the Army:

(District Engineer)

(Date)

Transferee hereby agrees to comply with the terms and conditions of this permit.

(Transferee)

(Date)

APPENDIX B-MEMORANDUM OF UNDERSTANDING BETWEEN THE SECRETARY OF THE INTERIOR AND THE SECRETARY OF THE ARMY

In recognition of the responsibilities of the Secretary of the Army under sections 10 and 13 of the Act of March 3, 1899 (33 U.S.C. 403 and 407), relating to the control of dredging, filling, and excavation in the navigable waters of the United States, and the control of refuse in such waters, and the interrelationship of those responsibilities with the responsibilities of the Secretary of the Interior under the Federal Water Pollution Control Act, as amended (33 U.S.C. 466 et seq.), the Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661-666c), and the Fish and Wildlife Act of 1956, as amended (16 U.S.C. 742a et seq.), relating to the

control and prevention of water pollution in such waters and the conservation of the Nation's natural resources and related environment, including fish and wildlife and recreational values therein; in recognition of our joint responsibilities under Executive Order No. 11288 to improve water quality through the prevention, control, and abatement of water pollution from Federal and federally licensed activities; and in recognition of other provisions of law and policy, we, the two Secretaries, adopt the following policies and procedures:

POLICIES

1. It is the policy of the two Secretaries that there shall be full coordination and cooperation between their respective Departments on the above responsibilities at all organizational levels, and it is their view that maximum efforts in the discharge of those responsibilities, including the resolution of differing views, must be undertaken at the earliest practicable time and at the field organizational unit most directly concerned. Accordingly, District Engineers of the U.S. Army Corps of Engineers shall coordinate with the Regional Directors of the Secretary of the Interior on fish and wildlife, recreation, and pollution problems associated with dredging, filling, and excavation operations to be conducted under permits issued under the 1899 Act in the navigable waters of the United States, and they shall avail themselves of the technical advice and assistance which such Directors may provide.

2. The Secretary of the Army will seek the advise and counsel of the Secretary of the Interior on difficult cases. If the Secretary of the Interior advises that proposed operations will unreasonably impair natural resources or the related environment, including the fish and wildlife and recreational values thereof, or will reduce the quality of such waters in violation of applicable water quality standards, the Secretary of the Army in acting on the request for a permit will carefully evaluate the advantages and benefits of the operations in relation to the resultant loss or damage, including all data presented by the Secretary of the Interior, and will either deny the permit or include such conditions in the permit as he determines to be in the public interest, including provisions that will assure compliance with water quality standards established in accordance with law.

PROCEDURES FOR CARRYING OUT THESE
POLICIES

1. Upon receipt of an application for a permit for dredging, filling, excavation, or other related work in navigable waters of the United States, the District Engineers shall send notices to all interested parties,

including the appropriate Regional Directors of the Federal Water Pollution Control Administration, the United States Fish and Wildlife Service, and the National Park Service of the Department of the Interior, and the appropriate State conservation, resources, and water pollution agencies.

2. Such Regional Directors of the Secretary of the Interior shall immediately make such studies and investigations as they deem necessary or desirable, consult with the appropriate State agencies, and advise the District Engineers whether the work proposed by the permit applicant, including the deposit of any material in or near the navigable waters of the United States, will reduce the quality of such waters in violation of applicable water quality standards or unreasonably impair natural resources or the related environment.

3. The District Engineer will hold public hearings on permit applications whenever response to a public notice indicates that hearings are desirable to afford all interested parties full opportunity to be heard on objections raised.

4. The District Engineer, in deciding whether a permit should be issued, shall weigh all relevant factors in reaching his decision. In any case where Directors of the Secretary of the Interior advise the District Engineers that proposed work will impair the water quality in violation of applicable water quality standards or unreasonably impair the natural resources or the related environment, he shall, within the limits of his responsibility, encourage the applicant to take steps that will resolve the objections to the work. Failing in this respect, the District Engineer shall forward the case for the consideration of the Chief of Engineers and the appropriate Regional Director of the Secretary of the Interior shall submit his views and recommendations to his agency's Washington headquarters.

5. The Chief of Engineers shall refer to the Under Secretary of the Interior all those cases referred to him containing unresolved substantive differences of views and he shall include his analysis thereof, for the purpose of obtaining the Department of Interior's comments prior to final determination of the issues.

6. In those cases where the Chief of Engineers and the Under Secretary are unable to resolve the remaining issues, the cases will be referred to the Secretary of the Army for decision in consultation with the Secretary of the Interior.

7. If in the course of operations within this understanding, either Secretary finds its terms in need of modification, he may notify the other of the nature of the desired changes. In that event the Secretaries shall within 90 days negotiate such amendment as is considered desirable or may agree upon

[blocks in formation]

regulation

prescribes

the

§ 326.1 Purpose. This policy, practice, and procedures to be followed by the Corps of Engineers in connection with activities requiring Department of the Army permits that are performed without prior authorization.

§ 326.2 Discovery of unauthorized activity in progress.

When the District Engineer becomes aware of any unauthorized activity which is still in progress, he shall immediately issue a cease and desist order to all persons responsible for and/or involved in the performance of the activity. If appropriate, the District Engineer may also order interim protective measures to be taken in order to protect the public interest. § 326.3 Investigation.

The District Engineer shall commence an immediate investigation of all unauthorized activities brought to his attention to ascertain the facts surrounding the activity. In making this investigation, the District Engineer shall solicit the views of the Regional Adminstrator of the Environmental Protection Agency, the Regional Director of the U.S. Fish and Wildlife Service, and the Regional Di

rector of the National Marine Fisheries Service, and other appropriate Federal, State, and local agencies. he shall also request the persons involved in the unauthorized activity to provide appropriate information on the activity to assist him in his evaluation and in recommending the course of action to be taken. The District Engineer shall evaluate the information and views developed during this investigation in conjunction with the appropriate factors and criteria that pertain to the particular unauthorized activity as cited in 33 CFR Parts 320, 321, 322, 323, and 324, and the guidance contained in § 326.4, below. Following this evaluation, the District Engineer shall formulate recommendations as to the appropriate administrative and/or legal action to be taken.

[blocks in formation]

(2) Civil action. Civil action is considered appropriate when the preliminary evaluation of the unauthorized activity reveals that (i) restoration is in the public interest and attempts to secure voluntary restoration have failed, or (ii) the unauthorized activity is in the public interest but must be altered or modified by judicial order because attempts to secure voluntary compliance have failed, or (iii) a civil penalty under Section 309 of the FWPCA is warranted.

(b) Preparation of case. If the District Engineer determines that legal action is appropriate, he shall prepare a litigation report which shall contain an analysis of the data and information obtained during his investigation and a recommendation of appropriate civil and criminal action. In those cases where the analysis of the facts

developed during his investigation (when made in conjunction with the appropriate factors and criteria specified in 33 CFR Parts 320, 321, 322, 323, and 324) leads to the preliminary conclusion that removal of the unauthorized activity is in the public interest, the District Engineer shall also recommend restoration of the area to its original or comparable condition.

(c) Referral to local U.S. Attorney. Except as provided in subsection (d), District Engineers are authorized to refer the following cases directly to the local U.S. Attorney.

(1) All unauthorized structures or work in or affecting navigable waters of the United States that fall exclusively within the purview of Section 10 of the River and Harbor Act of 1899 (see 33 CFR Part 322) for which a criminal fine or penalty under Section 12 of that Act (33 U.S.C. 406) is considered appropriate.

(2) All civil actions involving small unauthorized structures, such as piers, which the District Engineer determines are (i) not in the public interest and therefore must be removed, or (ii) are in the public interest but must be altered or modified by judicial order, because attempts to secure voluntary compliance have failed.

(3) All violations of Section 301 of the Federal Water Pollution Control Act Amendments of 1972 (33 U.S.C. 1311) involving the unauthorized discharge of dredged or fill material into the waters of the United States where the District Engineer determines, with the concurrence of the Regional Administrator, that civil and/or criminal action pursuant to Section 309 of the FWPCA is appropriate.

(4) All cases for which a temporary restraining order and/or preliminary injunction is appropriate following noncompliance with a cease and desist

order.

Information copies of all letters of referral shall be forwarded to the Chief of Engineers, ATTN: DAENCCK, and the Chief Pollution Control Section, Land and Natural Resources Division, Department of Justice, Washington, D.C. 20530.

(d) Referral to Office, Chief of Engineers. District Engineers shall prepare

40-092 0-79--45

and forward a litigation report to the Office, Chief of Engineers, ATTN: DAEN-CCK, for all other cases not identified in subsection (c) in which civil and/or criminal action is considered appropriate, including:

(1) All cases involving significant questions of law or fact;

(2) All cases involving discharges of dredged or fill material into waters of the United States that are not interstate waters or navigable waters of the United States, or part of a surface tributary system to these waters;

(3) All cases involving recommendations for substantial or complete restoration;

(4) All cases involving violations of Section 9 of the River and Harbor Act of 1899; and

(5) All cases involving violations of the Marine Protection, Research and Sanctuaries Act of 1972.

(e) If the District Engineer refers a case to the local U.S. Attorney or if criminal and/or civil action is instituted against the responsible person for any unauthorized activity, the District Engineer shall not accept for processing any application for a Department of the Army permit until final disposition of the referral action and/or all judicial proceedings, including the payment of all prescribed penalties and fines and/or completion of all work ordered by the court. Thereafter, the District Engineer may accept an application for a permit; provided, that with respect to any judicial order requiring partial or total restoration of an area, the District Engineer, if so ordered by the court, shall supervise this restoration effort and may allow the responsible persons to apply for a permit for only that portion of the unauthorized activity for which restoration has not been so ordered.

§ 326.5 Processing after-the-fact applications.

In those cases in which the District Engineer determines that the unauthorized activity does not warrant legal action, the following procedures shall be followed.

(a) Precessing and evaluation of applications for after-the-fact authorizations for activities undertaken without

the required Department of the Army permits will in all other respects follow the standard policies and procedures of 33 CFR Parts 320-325. Thus, authorization may still be denied in accordance with the policies and procedures of those regulations.

(b) Where after-the-fact authorization in accordance with this paragraph is determined to be in the public interest, the standard permit form for the activity will be used, omitting inappropriate conditions, and including whatever special conditions the District Engineer may deem appropriate to mitigate or prevent undesirable effects which may have occurred or might

occur.

(c) Where after-the-fact authorization is not determined to be in the public interest, the notification of the denial of the permit will prescribe any corrective actions to be taken in connection with the work already accomplished, including restoration of those areas subject to denial, and establish a reasonable period of time for the applicant to complete such actions. The District Engineer, after denial of the permit, will again consider whether civil and/or criminal action is appropriate in accordance with § 326.4.

(d) If the applicant declines to accept the proposed permit conditions, or fails to take corrective action prescribed in the notification of denial, or if the District Engineer determines, after denying the permit application, that legal action is appropriate, the matter will be referred to the Chief of Engineers. ATTN: DAEN-CCK, with recommendations for appropriate

[blocks in formation]
« AnteriorContinuar »